Rock-detection

A system for rock handling and rock handling by remote loading.

Rock fragments come from hanging walls and with poor blasting. The largest suitable rock size in the system without measures is approx 70 - 100cm. To ensure that rock will not interfere with production, it is desirable that rock is detected and handled within 2.5 minutes.

 

LKAB, Atlas Copco and ProcessIT are currently interested in carrying out a concept study. Boliden has also expressed interest.

 

ProjectnameRock-detection

Project
number
2005:20

Status Avslutad

Activity Förstudie

PartnersAtlas Copco, LKAB, Umeå universitet

ContactThomas Hellström

Web 

 

PROJECT Overview